NARENDRANAGAR BYPASS, PH-I
SLOPE CONSOLIDATION

  1. Home
  2. Project
  3. NARENDRANAGAR BYPASS, PH-I – SLOPE CONSOLIDATION

P&G Geohazard Solutions played a pivotal role in the execution of Tunnel T47 and T48 as part of the prestigious Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, aimed at connecting Jammu, Srinagar, and Baramulla. This strategic infrastructure initiative is one of India’s most challenging and ambitious railway projects, given the extreme Himalayan terrain and harsh weather conditions.

In the state of Jammu & Kashmir, P&G provided advanced geohazard mitigation solutions to ensure the stability and safety of the tunnel portals and surrounding slopes. The successful execution of this project highlights P&G’s technical expertise and commitment to supporting national infrastructure through innovative and reliable engineering solutions.

project gallery

location

NARENDRANAGAR BYPASS, PH-I – SLOPE CONSOLIDATION, UTTARAKHAND

Solution Implemented

Self – drilling Anchors (R 38, L:9m, Pattern: 2m x 2m) High Stepped CC Wall, M25 Grade, Gabion Wall

Total Area of Stabilization

700 Sq.m Max height of Slope: 22 meters

scope of work

Design of Protection System Turnkey Execution Consultant: THDC India Ltd.

completion date

Oct 22 – Jan 23

Call Support Center 24/7

+1 809 120 6705

Write To Us

info@domain.com

Contact us

Get in touch with us