P&G Geohazard Solutions undertook the stabilization of the uphill side of the Rishikesh–Dharasu road under Phase II of the Narendranagar Bypass project in Uttarakhand. This critical route, located in a landslide-prone Himalayan zone, required immediate and reliable intervention to ensure the safety of commuters and the durability of the road infrastructure.

To address the slope instability, P&G deployed high tensile rolled cable nets in combination with self-drilling anchors, providing a flexible yet robust solution tailored to the terrain. This project reinforced P&G’s commitment to delivering effective slope stabilization in geologically sensitive regions using advanced, site-specific technologies.

project gallery

location

NARENDRANAGAR BYPASS PH - II, UTTARAKHAND

Total Area of Stabilization

7,000 Sq.m Max height of Slope:90 meters

Solution Implemented

Self – drilling Anchors (R 38, L:8m, Pattern: 2m x 2m) ETA Certified High Tensile Rope Net System TechSlope 50x50/2.7 Geotextile Wrapped Perforated PVC Pipe, Dia:51mm, L:10m

scope of work

Supply & installation of Protection System Design Consultant: THDC India Ltd. Authority Engineer: Ayoleeza Consultants Pvt. Ltd.

completion date

Sep 23 – Jul 24