P&G Geohazard Solutions played a pivotal role in the execution of Tunnel T47 and T48 as part of the prestigious Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, aimed at connecting Jammu, Srinagar, and Baramulla. This strategic infrastructure initiative is one of India’s most challenging and ambitious railway projects, given the extreme Himalayan terrain and harsh weather conditions.
In the state of Jammu & Kashmir, P&G provided advanced geohazard mitigation solutions to ensure the stability and safety of the tunnel portals and surrounding slopes. The successful execution of this project highlights P&G’s technical expertise and commitment to supporting national infrastructure through innovative and reliable engineering solutions.
location
TUNNEL T47 & T48, USBRL, J&K
Total Area of Stabilization
5,300 Sq.m Max height of Slope: 68 meters
Systems Used
CT Bolt (M25, L:5m & 6m Pattern: 2m x 2m) ETA Certified High Tensile Rope Net System CE & BIS Certified DT Mesh (100 x 120 mm,) ETA Certified Flexible Rockfall Barrier 1500 KJ
scope of work
Topographic Survey using LiDAR & Drone Design of Protection System Vetting from IIT Roorkee
completion date
Mar 22 – Oct 22
Our post-construction services gives you peace of mind knowing that we are still here for you even after.